KCC Power

Situation: Public utility power (Regideso)in Bujumbura is lacking multiple hours most days. KCC requires power and when out is using the generator. The generator is fueled by diesel which is very expensive.

​

Stakeholders:
Trustee committee : Likely lead by Ian, Martin, Paul C

Advisor : Nathan Overns

Hotel Manager : Celestin Kuwimana
Scripture Union LR : Etienne Munezero

Project Manager : John Peake

GLO COO : Paul Tilbury

Renew Gen completed an initial load assessment estimating 2100 kWh a day used by KCC. ~88/Hr or 65/Hr at night @ 110/Hr during the day.

A generator was installed at KCC. There are now 2 generators, each one is 275 kva; which equals 220 kWh can be produced per hour; double the estimated daytime consumption. One is new, brand new. The purchase price was $55,000. Value is higher. The older one is valued at less. And the previous was was going to be sold after repair or for parts.

Cost:
kWh from Regideso is ~$0.07
kWh from generator is $0.50-0.70 depending on utilization and assuming 5 year depreciation

kWh from batteries and/or with solar is ~$0.15 +/- depending on configuration on design.

​

So for 

Future Notes

2015-2017